Projects

TORPEE CREEK BRIDGE

Carter, Wisconsin
Client:

Forest County Potawatomi Community

Size:

24 feet wide
8 feet high

Project Manager:

Matt Greely

Service Groups:
Market Served:
Project Overview:

This structure was to replace two 48” culverts under STH ‘32’. The resulting design was a 24-ft. wide by 8-ft. high, bottomless (3-sided) bridge supported on steel piling. The final structure was a buried single span bridge with approximately 3-4 ft. of overburden.

Additional design features included:

  • Decorative/Community Sensitive Design-Fieldstone Stream Signage
  • Improvements to Stream Morphology for Fish Passage
  • Provisions for Wildlife passage
  • Temporary bypass Roadway to avoid detour
  • Beam Guard
  • Temporary Diversion Channel to accommodate flow during construction
Share Project: