Stone Lake WWTF

Crandon, WI back to portfolio


Permit changes and the need to treat septage led Forest County Potawatomi Community (FCPC) to retain McMAHON to design an upgrade to their recirculating sand filter.  The initial design led to a designer-led design/build project utilizing McMahon, Inc. (a McMahon Group company).  A septic receiving station with screening, storage and solids dewatering was provided. To meet a 0.075 mg/l total phosphorus limit, a ballasted high rate clarifier (Actiflo) was utilized along with a flow equalization basin. The entire treatment process is enclosed in a 6,000 s.f. building that includes two truck bays.


Client

Forest County Potawatomi Community

Project Manager

Tom Kispert